Control limits and alert math

Baselines, control charts, sample-size gates, false alarms.

learn · improvement loop

A threshold is only as good as its arithmetic. This page covers how to draw a baseline, how to put control limits around a rate, how many units a line needs before it can see anything, and how often a set of lines will cry wolf. The worked examples use small-account numbers, because that's where most of these choices go wrong.

metric → baseline · limits · gate → compare → fire or stay quiet

Statistical process control, for a growth pipeline.

what it is, in industry terms

Manufacturing has used control charts since the 1920s: measure a process, draw a center line and limits from its own history, and only intervene when a point lands outside the limits or a run of points drifts. The same idea separates a real drop in a play's reply rate from an unlucky week. Every rate in the pipeline is a share of units (replies per touch, real matches per label), so the workhorse here is the p-chart. Small counts get Wilson intervals; slow drifts get EWMA or CUSUM.

From history to a line.

how it works

  1. History — 4 to 8 weeks same version
  2. Clean it — drop incident days split by weekday?
  3. Center line — p̄ or median
  4. Limits — ±3σ act ±2σ watch
  5. Gate — min sample n > 9(1−p̄)/p̄
  6. Freeze — baseline row until re-fit
  1. Take the history — Four to eight weeks of the metric on the current version of whatever it watches. Older history describes a different system.

  2. Clean it — Drop days with known incidents (a dead source, a dispatcher outage). Note weekday patterns: a Monday dip in post reach isn't a drop.

  3. Draw the center — The baseline rate over the clean history. For skewed costs, use the median.

  4. Draw the limits — ±3σ for action, ±2σ for a watch note, with σ computed from this period's own n.

  5. Set the gate — The smallest n where the lower limit clears zero, or 30 units, whichever is larger.

  6. Freeze it — Store the baseline as a row. Re-fit on a schedule or when the watched version changes, never silently.

The p-chart: center line ± 3 standard errors.

control limits for a rate

center p̄ = baseline rate (e.g. replies ÷ touches over the last 4 to 8 weeks) sigma σ = √( p̄ · (1 − p̄) / n ) n = units in this period limits = p̄ ± 3σ (act) p̄ ± 2σ (watch)

Worked example: baseline rate p̄ = 8%, n = 30 units in the period, observed rate 3.0%.

8.0% — center line

0.0% — lower limit (floored at 0: blind)

22.9% — upper limit

noise — this period

With n = 30 the lower limit is below zero, so this line cannot catch a drop. It needs at least 104 units per period: widen the window or use a Wilson gate.

A lower limit below zero means the line is blind.

minimum sample

If p̄ − 3σ is under zero, no observed rate can ever fall below the limit: a drop to nothing still reads as noise. The lower limit only clears zero when n > 9 · (1 − p̄) / p̄. That's the real minimum sample for a floor on a rate, and it's why weekly limits on low rates rarely work for a small account.

Baseline rateUnits needed for a usable lower limitAt 30 units a week, use a window of
2%at least 442 units15 weeks
5%at least 172 units6 weeks
8%at least 104 units4 weeks
10%at least 82 units3 weeks
15%at least 52 units2 weeks
20%at least 37 units2 weeks
30%at least 22 units1 week
50%at least 10 units1 week

Wilson intervals: honest ranges for a handful of units.

small counts

With 3 replies out of 20, "15%" hides how little is known. The Wilson interval gives the range the true rate plausibly sits in. A threshold on a small count fires only when the whole interval is past the line, not when the point estimate is.

Worked example: 3 successes out of 20 units, against a floor of 10%.

15.0% — point estimate

5.2% – 36.0% — 95% Wilson range

not enough evidence yet — keep collecting

A fixed line at 10% on the point estimate alone would stay quiet. The interval says the data cannot tell yet.

Many lines, checked often, will fire by chance.

false alarms add up

A single 3-sigma line on a stable process fires by chance about 0.27% of the time per check (two-sided). Twenty lines checked daily is 140 checks a week. The worked example below shows how often at least one fires with nothing wrong.

Worked example: 20 active lines, each checked 7 times a week, at 3σ.

0.27% — chance per check

140 — checks a week

32% — weeks with at least one false alarm

0.38 — expected false alarms a week

Assumes independent checks on stable processes. Real metrics are correlated, which lowers the count a little; it doesn't change the lesson.

what to do about it

Use 3 sigma for anything that acts and 2 sigma only for a "watch" note. Require 2 consecutive periods outside the limit before a diagnostic line opens a hypothesis. Keep guardrails (stop requests, touched holdouts) as plain ceilings: there a false alarm is cheap and a miss is not.

Baselines are rows too.

the baseline object

A threshold compares against a frozen baseline, never a number recomputed at firing time. The alert stores the baseline it used.

FieldTypeWhat it holds
baseline_iduuidOne row per baseline fit
metric_id + scoperefWhat it describes, e.g. reply rate for one play
watched_versiontextThe prompt, detector or play version the history came from
windowdatesThe history used, after cleaning
excludedlistDays dropped and why (incident ids)
centernumberp̄, mean or median
sigma_basistextHow σ is computed: per-period n, or pooled
limitsobjectAct and watch limits, and the minimum sample
methodenumfixed · p-chart · EWMA · CUSUM · Wilson gate
fitted_attimestampWhen it was frozen
supersedesbaseline_idThe previous fit, kept for audit

a reply-rate baseline for one play

{
 "baseline_id": "bl_91a2…",
 "metric_id": "reply_rate_per_touch_7d",
 "scope": {
 "kind": "play",
 "id": "listen-and-reply"
 },
 "watched_version": "opener v5",
 "window": {
 "from": "2026-09-21",
 "to": "2026-10-18"
 },
 "excluded": [
 {
 "day": "2026-10-02",
 "why": "dispatcher outage"
 }
 ],
 "center": 0.11,
 "sigma_basis": "per-period n",
 "limits": {
 "act_sigma": 3,
 "watch_sigma": 2,
 "min_sample": 73
 },
 "method": "p-chart",
 "fitted_at": "2026-10-19T09:00:00Z",
 "supersedes": "bl_77f0…",
 "note": "example values"
}

Which method for which metric.

methods

Fixed line

use for
Guardrails: stop requests, touched holdouts, error rates.
good
Simple, auditable, right when the line comes from policy, not history.
catch
Ignores noise; needs a minimum sample.

p-chart (Shewhart)

use for
Rates per period with enough units: reply rate per play, precision per detector.
good
Limits adapt to each period's n.
catch
Blind on low rates with small n; slow to see small drifts.

EWMA

use for
Slow drift in a rate: edit distance creeping up, reply rate sagging.
good
Weights recent periods more, catches small sustained moves.
catch
Needs a smoothing choice (λ around 0.2); lags sudden jumps.

CUSUM

use for
Detecting a shift as early as possible once it starts.
good
Accumulates small deviations; good for 'did something change this week'.
catch
Harder to explain; needs a target shift size.

Wilson gate

use for
Small counts: a new play's first 20 touches, a detector's first labels.
good
Honest ranges at tiny n; fire only when the whole range is past the line.
catch
Wide ranges mean late firing; that's the cost of small data.

c-chart (Poisson)

use for
Counts per day: matches per detector, signals per trigger.
good
Catches spikes and droughts in volume.
catch
Weekday seasonality breaks it unless split by weekday.

Change vs baseline

use for
Costs and durations: cost per lead, minutes per draft.
good
Robust with a median baseline; easy to read.
catch
Pick the percent with the noise in mind; gate it.

Staleness timer

use for
Freshness: source age, Hot lead age, overdue readouts.
good
No statistics needed: time since last event.
catch
Needs the event's own timestamp, not the capture time.

Beta posterior

use for
Comparing a new version to the old on few units.
good
Gives the chance the new version is worse, with a prior from learnings.
catch
Prior choice matters; write it down before looking.

Three lines, set properly on small numbers.

illustrative example

These are examples to show the arithmetic, not measured rates.

  1. Reply rate on one play — Example: baseline 8%, about 30 touches a week. σ = √(0.08 × 0.92 / 30) ≈ 5 points, so the weekly lower limit is below zero: blind. A usable floor needs at least 104 touches, so read it on a rolling 4-week window (about 120 touches) or use EWMA weekly.

  2. Detector precision — Example: baseline 71% over the last 50 labels. σ ≈ √(0.71 × 0.29 / 50) ≈ 6.4 points; the 3σ lower limit is about 52%. The catalog's starter floor of 60% sits inside that, so expect it to fire on noise sometimes; after a month of labeled firings, re-fit.

  3. Stop requests — Example: a ceiling of 2 per 100 touches over 7 days, gated at 50 touches. This stays a fixed line on purpose: one bad week of complaints costs more than a false pause.

How the math gets misused.

failure modes

Limits on mixed versions — The baseline spans a prompt change, so the limits are too wide and miss the new version's drop. · Store watched_version on every baseline; reset on change.

Weekday seasonality — Posts on weekends always reach fewer people; a fixed limit fires every Saturday. · Split baselines by weekday for posting metrics, or compare to the same weekday.

Peeking at limits — Re-drawing limits after a bad week makes the bad week normal. · Re-fit on schedule only; the bad week stays outside the fit window.

Ignoring n — Using last month's σ for a week with a third of the volume. · σ always uses the current period's n.

One point, one action — Opening a test on one point outside a watch limit. · Act on 3σ, or 2 consecutive periods past 2σ.

What the math needs stored.

data to capture

record — Every baseline fit with its window, exclusions, method and watched version; every comparison's value, n and limits.

label — Whether the period was later confirmed abnormal (incident, real change) or normal.

trains — Better sigma widths per metric, and which method (p-chart, EWMA, CUSUM) catches real problems earliest on this account.

test — Back-test a method on the labeled history before switching a threshold to it.